免费观看mv大片高清,150部香港三级合集在线播放,国产熟妇久久777777,c够了没有三根一起会坏掉骨科

Hello, welcome to visit Foshan Zhongshun Water Treatment Technology Co., Ltd Official website!

National unified service hotline:0757-26616782

     中文
PRODUCT
CONTACT US 聯(lián)系我們

Foshan Zhongshun Water Treatment Technology Co., Ltd

Tel: 0757-26616782 26628076

Email: sdzs@sinozs.com

Website: www.huolongcm.com

Official account: zs water

Address: No. 3 East Hongye Road, Ronggui Rongqi Avenue, Shunde District, Foshan City, Guangdong Province


Your current location: HOME > PRODUCT > Water softener
Continuous water softener deionization exchange softening treatment

連續(xù)式軟水+中文LOGO+底圖.jpg

    The continuous water softener is the latest product developed by our company based on years of production experience. It inherits the advantages of continuous operation of the flow bed and thoroughly improves the control performance of traditional equipment, making the equipment operation performance more stable and reliable.

    SRL continuous water softeners are divided into two forms: single stage exchange and double stage exchange. The single-stage exchange SRL1 series is suitable for softening water treatment in low-pressure boilers, textiles, printing and dyeing, and circulating cooling water supply. The two-stage exchange SRL2 series is suitable for softening high hardness water or treating extremely low hardness softening water in medium pressure boilers.

Equipment advantages:

● Long term continuous operation, without any issues of running cycle pauses or water quality fluctuations.

● Low operating costs, low consumption of regenerants, low self consumption of water, and sufficient production of soft water.

● Automatic salt dissolution and filtration, without the need for a salt tank, and avoiding the heavy labor of manual mixing.

● The equipment is more compact, occupies less land, is easy to install, and is easy to operate and maintain.

Main technical parameters:

微信圖片_20230605115251.png

Precautions:

1.Before installing the equipment, users should arrange the platform of the equipment to be at least 100mm above the ground, and set up drainage ditches around it to timely discharge wastewater.

2. If the hardness of the raw water exceeds 250mg/L, or other physical and chemical indicators cannot meet the requirements for equipment inflow, water quality information can be provided, and both parties can negotiate to design separately or use other equipment produced by our company to achieve the best treatment effect.


Process schematic diagram:

1685937087233432.png

Layout:

1685937114449890.png

1685937129899727.png

主站蜘蛛池模板: 洛隆县| 郓城县| 即墨市| 敖汉旗| 古浪县| 南京市| 武乡县| 五大连池市| 武邑县| 通州市| 巫溪县| 聊城市| 开阳县| 同仁县| 巴林右旗| 洞口县| 正安县| 定边县| 温宿县| 宜兰市| 策勒县| 麻栗坡县| 长武县| 墨脱县| 那坡县| 萨嘎县| 武穴市| 邵阳县| 朝阳市| 交口县| 和田市| 寿光市| 巫山县| 巴林右旗| 德令哈市| 富宁县| 莱芜市| 泗洪县| 普兰店市| 延川县| 永吉县|